网球比分捷报网|今日推荐足球比分预测|球探手机版|球探比分足球即时比分比,今日竞彩足球对阵表,比分网球探,法甲赛程2024赛程表

軟題庫(kù) 培訓(xùn)課程
試卷年份2009年上半年
試題題型【單選題】
試題內(nèi)容

Many of the activities performed during the preliminary investigation are still being conducted in(1 ), but in much greater depth than before. During this phase, the analyst must become  fully aware of the(2 ) and must develop enough knowledge about the(3 ) and the existing systems to enable an effective solution to be proposed and implemented. Besides the(4 ) for process and data of current system, the deliverable from this phase also includes the(5 ) for the proposed system.
(1)A. analysis phase
B.  design phase
C.  implementation phase
D. maintenance phase
(2)A. main symptom
B.  root problem
C.  final blueprint
D.  data specification
(3)A. hardware environment
B. testing environment
C. software environment
D. business environment
(4)A. logical models
B. physical models
C. design models
D. implementation models
(5)A. hardware and software specification
B. system performance specification
C. formal requirements definition
D. general problem statement

查看答案

相關(guān)試題